FAITH Hangar
Built for TSC (The Spaceship Company – Sister Company to Virgin Galactic – Richard Branson), Final Assembly Integration Test Hangar (FAITH), to assemble components to build White Knight Two mothership, and Spaceship Two sub-orbital spacecraft for commercial space flight. Design build 63590 square foot facility consisting of 56640 square foot hangar, and 8400 square foot office space located off taxiway B at the Mojave Air & Space Port. 246 foot by 236 wide clear span pre-engineered steel structure with a 220 foot by 30 foot tall door opening. Entire structure is conditioned by Daikin VRF heating and cooling system helping to acheive LEED Certification. Project completed in 10 months.